The pitch is always the same: turnkey installations that “just work”, delivered fast, with one supplier accountable from start to finish. But without pre-project surveys, that promise rests on assumptions-about your site, your loads, your people, and your existing kit. When those assumptions meet reality, the failure doesn’t look dramatic at first; it looks like slippage, rework, and quiet blame.
You feel it in the weeks that follow. The programme still reads “on track”, yet every meeting adds a new caveat: access issues, unexpected interfaces, commissioning delays, “minor” variations that somehow cost five figures. It’s rarely bad luck. It’s missing diagnostics.
The myth that breaks turnkey: “We’ll sort it on site”
Turnkey is meant to remove friction. One contract, one delivery plan, one handover, no gaps between trades. The problem is that turnkey also compresses time-the very thing you need to understand what you’re inheriting.
Many teams treat discovery as overhead, so they skip it or shrink it to a quick walk-round. Then the project starts with three blind spots:
- What condition the existing environment is actually in
- Where the interfaces really sit (and who owns them)
- What “done” means in measurable, testable terms
Turnkey doesn’t fail because people don’t know how to build. It fails because people don’t know what they’re building into.
What diagnostics look like in the real world
Diagnostics are not a glossy report. They are the unglamorous act of making the hidden visible before money is committed and dates are promised.
In practical terms, diagnostics sit inside pre-project surveys and include tasks like:
- Verifying dimensions and access routes (not trusting old drawings)
- Checking power, data, drainage, ventilation, and earthing where relevant
- Mapping dependencies: shutdown windows, permits, neighbour constraints, landlord rules
- Confirming the state of existing assets you plan to reuse
- Interviewing users and maintainers to surface “this always trips” knowledge
A supplier can be competent and still miss this if the brief incentivises speed over certainty. Diagnostics are the correction to that bias.
A simple example: the door that kills the schedule
The equipment fits on paper. It even fits through the loading bay. Then it meets a corridor turn, a fire door closer, a lift weight limit, or a ceiling bulkhead no one measured. You don’t lose a day; you lose the sequence. Other trades stack up behind you, and the “simple” solution becomes out-of-hours work, dismantling, or hiring specialist movers at short notice.
That’s not a logistics problem. It’s a diagnostic problem that arrived late.
The usual failure modes when surveys are skipped
Most turnkey projects don’t collapse in one dramatic moment. They decay through predictable, expensive patterns.
1) Variations become the business model
When the baseline is vague, the change control log fills fast. The client feels ambushed; the contractor feels unfairly squeezed. Both sides point at the contract, and the relationship turns into invoice management.
Common triggers include:
- Unrecorded existing services and non-compliant legacy wiring
- Structural constraints that limit fixings or add secondary steelwork
- Asbestos, contamination, or fire-stopping gaps discovered mid-install
2) Interfaces go missing, then reappear as disputes
Turnkey sounds like “one throat to choke”, but most installations still touch third parties: IT, security, building management, utilities, landlords, insurers, regulators. If those interfaces aren’t mapped early, they show up as “someone else’s responsibility” precisely when you need them signed off.
A good diagnostic phase forces a hard question: who owns each boundary, and what proof closes it?
3) Commissioning turns into a blame carousel
Commissioning is where assumptions get tested. If preconditions weren’t verified-loads, airflow, signal quality, temperatures, user training-then failures look like defects even when the equipment is fine.
You see symptoms like:
- Repeated call-backs after “practical completion”
- Performance that passes a basic test but fails in normal operation
- Site teams improvising settings to keep things running, with no record
The handover becomes a negotiation, not an event.
Pre-project surveys: the cheapest point to be honest
Pre-project surveys are where you pay for certainty at the lowest cost per answer. Later, every answer comes wrapped in delay, disruption, and contractual heat.
A survey phase that actually protects a turnkey outcome usually has three outputs:
- A verified scope: what is included, excluded, and assumed-written in plain language.
- A risk map: not just a register, but who is mitigating what, by when.
- Acceptance criteria: measurable tests that define “ready to hand over”.
If any of those are fuzzy, you’re not buying turnkey. You’re buying a best-efforts guess with a single logo on the paperwork.
A diagnostic checklist you can use before you sign
You don’t need to become a technical expert to demand the right questions. You need to insist that someone answers them, with evidence.
Ask for the diagnostics plan to cover:
- Site reality: measured surveys, photos, access trials, and known constraints
- Utilities: capacity checks and responsibility for upgrades
- Integration: what you’re connecting to, and who controls it
- Operations: maintenance access, spares, training, and documentation
- Proof: test scripts, witness points, and pass/fail thresholds
Then pin it to dates. Diagnostics that happen after procurement are better than nothing, but they remove the leverage that makes honesty easy.
The paradox: more front-end work makes delivery faster
The quickest turnkey projects aren’t the ones that rush the beginning. They’re the ones that shorten the feedback loop between assumption and fact.
If you want a simple rule that holds up under pressure, use this:
If the supplier can’t explain how they’ll diagnose your site before they price certainty, they’re pricing uncertainty-and you’ll pay the difference later.
FAQ:
- Isn’t “turnkey” supposed to include everything already? It should include delivery, but it can’t include unknowns unless diagnostics turn them into knowns. Contracts often hide assumptions in small print.
- How long should pre-project surveys take? Long enough to verify constraints and interfaces. For many installations that’s days, not weeks, but it depends on access, shutdown windows, and complexity.
- What’s the single biggest red flag? A fixed price offered without evidence: no measured survey, no utility checks, no interface map, and vague commissioning language.
- Can diagnostics be done without delaying the programme? Yes-when planned as parallel work early. It usually prevents far larger delays later during install and commissioning.